top of page
Discuss your project
aerial-drone-view-winery-metal-cisterns-with-bare-trees-fields-around-it-moldova.jpg

Home / Industries / Oil and gas

Industries

Oil and gas

Refineries and terminals,

closed without incident.

Decommissioning and demolition management, Owner’s Engineer and CDM services for refineries, gas terminals, tank farms and pipeline assets, from first study to the agreed end state.

check.png

ISO 9001 · 14001 · 45001

security (1).png

CDM 2015 Principal Designer

white-house.png

Refineries and high-hazard terminals

internet.png

United Kingdom and UAE

Hydrocarbon plant is never fully safe until it is proven empty. We plan the closure so that every line, vessel and tank is isolated, cleaned and gas-free before anyone cuts.

Whether the job is one redundant unit or a whole terminal, we manage the decommissioning, demolition and remediation of oil and gas assets on the client’s behalf. We define the end state for every system, scope the hazardous materials surveys, procure the specialist contractors and hold them to the plan, often beside units that are still operating.

SITE TYPES

Refineries

Gas processing and storage terminals

Crude and product tank farms

Pipelines and pumping stations

Jetties and loading facilities

Flare, utilities and offsites

WHAT WE SOLVE

The challenges on oil and gas sites

Hydrocarbon residues and gas-freeing

Residues in vessels, lines and tanks characterised and quantified before tender, so cleaning and gas-freeing are priced on evidence and signed off against the agreed end state before any demolition starts

Live units beside redundant plant

Isolations, exclusion zones, hot work controls and hazardous area classification built into the method, so the operating site keeps running.

Major accident regulation

COMAH in the UK, Seveso in Europe and the equivalent regimes elsewhere: notifications, safety report changes and regulator meetings planned into the programme, not bolted on.

Legacy insulation and hazardous materials

Asbestos, refractory fibre and lead paint on decades-old plant surveyed properly, so removal is priced on measured quantities, not presumptions.

QUESTIONS

Common questions

Not covered here? Our team will answer directly.

Discuss your project
Safety and compliance

Safety is the method.

Isolation, decontamination and preparation come first, on every site, under certified management systems.

ISO 9001

Quality management

ISO 14001

Environmental management

ISO 45001

Occupational health and safety

CDM 2015

Principal Designer

IDE

Institute of Demolition Engineers

APS

Association for Project Safety

TWf

Temporary Works Forum

Capability statement

Download the PDF

News

Reading for oil and gas operators

bottom of page