Decommissioning project management

02 Decommission

Asbestos and hazardous materials consultancy

Independent asbestos and hazardous materials consultancy for the owners of industrial sites. We help you understand your liabilities, scope the right surveys, procure competent contractors and hold them to the plan of work, from first survey to final clearance.

Discuss your project
01

Assess

02

Decommission

03

Demolish

04

Recover

05

Remediate

Gemini_Generated_Image_8k02dr8k02dr8k02.jpg
432ffe15-3745-4881-9b11-9ab4fac56921.png
SAFETY AND COMPLIANCE

Safety first.
On every site, in every plan.

Assurance is designed into every stage, protecting people, programme and reputation from day one.

ISO

45001

Occupational health & safety
ISO

14001

Environmental management
ISO

9001

Quality management
ISO

SSIP

Cyber Essentials +
UK

TWF Member

Principal Designer capability
ISO

IDE

Subject Matter Experts
ISO

APS

APS Principal Designers
ISO

GLOBAL

Subject Matter Experts
OVERVIEW

Independent of the contractor.

On the owner’s side from survey to clearance.

On a power station, refinery or chemical plant the asbestos and hazardous materials removal is often the largest single cost and the longest activity in the closure. Most of that cost is decided by the survey: a demolition survey that is poorly scoped or poorly managed leads to presumed materials, open-ended rates and removal that is priced on guesswork. The same applies to refractories, cristobalite, PCBs, lead paint, mercury and the rest of the hazardous materials in older plant.

We work for the owner and have no interest in the removal contract. Our qualified people manage asbestos liabilities, scope and manage surveys so removal is priced on measured quantities, prepare tender packages, assess tenders on method and risk as well as price, and monitor contractor compliance through the work. We advise on air testing and analyst appointment; we do not carry out air testing or removal ourselves.

AT A GLANCE
STAGE

02 Decommission

SITE TYPES

Power stations, refineries and terminals, chemical, petrochemical and pharmaceutical plants, nuclear licensed sites, energy from waste, manufacturing, ports

REGIONS

Worldwide, from hubs in the United Kingdom and the UAE

STANDARDS

Control of Asbestos Regulations 2012 (UK) and equivalent national regimes · HSG264 and HSG248 · CDM 2015 (UK) · ISO 9001 · 14001 · 45001

Scope

What's included

Independent management of the asbestos and hazardous materials liability on an industrial site, from the duty to manage through survey, procurement and removal to clearance.

Tender analysis

Isolation philosophy, sequence and verification agreed with the operator.

Contractor compliance and analyst advice

Isolation philosophy, sequence and verification agreed with the operator.

Asbestos management and duty to manage

Isolation philosophy, sequence and verification agreed with the operator.

Survey management

Isolation philosophy, sequence and verification agreed with the operator.

Hazardous materials (HazMat) surveys

Isolation philosophy, sequence and verification agreed with the operator.

Removal tender packages

Isolation philosophy, sequence and verification agreed with the operator.

Bacground
ONE PARTNER, WHOLE LIFECYCLE

Where this service sits

Asbestos and hazardous materials run through the whole closure. The survey belongs in the strategy, the removal belongs in decommissioning, and clearance is the gate to demolition.

How we work

Four steps to a safe, prepared site

01

Understand the liability

Registers, surveys and records reviewed; gaps and presumed materials identified.

02

Scope and manage the surveys

Demolition and HazMat surveys scoped to the plant and the method, and managed to completion.

03

Procure the removal

Tender package prepared, tenders assessed on method and risk, contractor appointed.

04

Monitor to clearance

Plans of work, enclosures, waste and records monitored; analyst appointment advised; clearance confirmed.

Related project
gas-leak-detection-v2.png
UK
Decommissioning PM
Petrochemical

Chemical site demolition case study:

How fixed-price tenders, scrap revenue and contract amendments written for demolition gave a UK chemical site owner greater cost certainty.

View case study
QUESTIONS

Common questions

Not covered here? Our team will answer directly.

Discuss your project
Across the lifecycle

Related services

All services
01 · Assess

Decommissioning and demolition strategy

Options, programme and cost tested before you commit, so the right scope goes to tender.

Explore service
02 · Decommission

Decommissioning project management

Isolation, cleaning and plant preparation managed to one safe programme.

Explore service
05 Remediate

Remediation and site closure management

Investigation, remediation and verification managed to the agreed end state.

Explore service