02 Decommission
Asbestos and hazardous materials consultancy
Independent asbestos and hazardous materials consultancy for the owners of industrial sites. We help you understand your liabilities, scope the right surveys, procure competent contractors and hold them to the plan of work, from first survey to final clearance.
01
Assess
02
Decommission
03
Demolish
04
Recover
05
Remediate


SAFETY AND COMPLIANCE
Safety first.
On every site, in every plan.
Assurance is designed into every stage, protecting people, programme and reputation from day one.
ISO
45001
Occupational health & safety
ISO
14001
Environmental management
ISO
9001
Quality management
ISO
SSIP
Cyber Essentials +
UK
TWF Member
Principal Designer capability
ISO
IDE
Subject Matter Experts
ISO
APS
APS Principal Designers
ISO
GLOBAL
Subject Matter Experts
OVERVIEW
Independent of the contractor.
On the owner’s side from survey to clearance.
On a power station, refinery or chemical plant the asbestos and hazardous materials removal is often the largest single cost and the longest activity in the closure. Most of that cost is decided by the survey: a demolition survey that is poorly scoped or poorly managed leads to presumed materials, open-ended rates and removal that is priced on guesswork. The same applies to refractories, cristobalite, PCBs, lead paint, mercury and the rest of the hazardous materials in older plant.
We work for the owner and have no interest in the removal contract. Our qualified people manage asbestos liabilities, scope and manage surveys so removal is priced on measured quantities, prepare tender packages, assess tenders on method and risk as well as price, and monitor contractor compliance through the work. We advise on air testing and analyst appointment; we do not carry out air testing or removal ourselves.
AT A GLANCE
STAGE
02 Decommission
SITE TYPES
Power stations, refineries and terminals, chemical, petrochemical and pharmaceutical plants, nuclear licensed sites, energy from waste, manufacturing, ports
REGIONS
Worldwide, from hubs in the United Kingdom and the UAE
STANDARDS
Control of Asbestos Regulations 2012 (UK) and equivalent national regimes · HSG264 and HSG248 · CDM 2015 (UK) · ISO 9001 · 14001 · 45001
Scope
What's included
Independent management of the asbestos and hazardous materials liability on an industrial site, from the duty to manage through survey, procurement and removal to clearance.
Tender analysis
Isolation philosophy, sequence and verification agreed with the operator.
Contractor compliance and analyst advice
Isolation philosophy, sequence and verification agreed with the operator.
Asbestos management and duty to manage
Isolation philosophy, sequence and verification agreed with the operator.
Survey management
Isolation philosophy, sequence and verification agreed with the operator.
Hazardous materials (HazMat) surveys
Isolation philosophy, sequence and verification agreed with the operator.
Removal tender packages
Isolation philosophy, sequence and verification agreed with the operator.

How we work
Four steps to a safe, prepared site
01
Understand the liability
Registers, surveys and records reviewed; gaps and presumed materials identified.
02
Scope and manage the surveys
Demolition and HazMat surveys scoped to the plant and the method, and managed to completion.
03
Procure the removal
Tender package prepared, tenders assessed on method and risk, contractor appointed.
04
Monitor to clearance
Plans of work, enclosures, waste and records monitored; analyst appointment advised; clearance confirmed.