
04 Recover
Scrap, asset recovery and waste strategy
The residual value in an industrial asset identified before tender and the waste from its closure routed under control. We advise owners on scrap, plant resale and waste strategy so value is priced in rather than given away and nothing leaves site without a record.
01
Assess
02
Decommission
03
Demolish
04
Recover
05
Remediate


SAFETY AND COMPLIANCE
Safety first.
On every site, in every plan.
Assurance is designed into every stage, protecting people, programme and reputation from day one.
ISO
45001
Occupational health & safety
ISO
14001
Environmental management
ISO
9001
Quality management
ISO
SSIP
Cyber Essentials +
UK
TWF Member
Principal Designer capability
ISO
IDE
Subject Matter Experts
ISO
APS
APS Principal Designers
ISO
GLOBAL
Subject Matter Experts
OVERVIEW
Know what it’s worth.
Before the contractor does.
On a large plant the scrap metal, the reusable equipment and the recoverable materials can be worth a great deal, and the demolition contractor knows that better than most owners. If the residual value is not quantified before tender, it is priced by the contractor, on the contractor’s terms. If the waste streams are not planned, cost and compliance risk arrive together in the final weeks.
We quantify the materials inventory and its value as part of the strategy, structure the tender so scrap and resale are dealt with transparently, identify plant worth removing intact, and set the waste strategy: classification, segregation, routes and records. During the project we monitor the contractor’s waste management and the duty-of-care trail, so the owner can show where everything went.
AT A GLANCE
STAGE
04 Recover
SITE TYPES
Refineries, terminals and tank farms, power stations, chemical, petrochemical and pharmaceutical plants, manufacturing
REGIONS
Worldwide, from hubs in the United Kingdom and the UAE
STANDARDS
Waste duty of care and hazardous waste regulations (UK) and equivalent national regimes · ISO 14001 · ISO 9001 · 45001
Scope
What's included
Residual value and waste planned from the strategy stage and monitored through delivery.
Contractor waste monitoring
Isolation philosophy, sequence and verification agreed with the operator.
Duty-of-care records
Isolation philosophy, sequence and verification agreed with the operator.
Asset recovery and plant resale
Isolation philosophy, sequence and verification agreed with the operator.
Materials inventory and scrap valuation
Isolation philosophy, sequence and verification agreed with the operator.
Waste strategy and classification
Isolation philosophy, sequence and verification agreed with the operator.
Tender structure for residual value
Isolation philosophy, sequence and verification agreed with the operator.

How we work
Four steps to a safe, prepared site
01
Inventory and value
Materials and plant quantified and valued at current prices as part of the strategy.
02
Structure the tender
Scrap, resale and waste responsibilities written into the tender and the contract.
03
Set the waste strategy
Classification, segregation, routes, carriers and records planned with the contractor.
04
Monitor and record
Movements, consignments and recoveries monitored and reported through to completion.



