top of page
Discuss your project
closeup-view-cylindrical-grinder-industrial-concept.jpg

Home  / Industries / Pharmaceutical

Industries

Pharmaceutical

Process and laboratory facilities,
closed without disrupting production.

Decommissioning and demolition management and CDM services for pharmaceutical manufacturing, laboratory and utility facilities, planned around live GMP operations.

check.png

ISO 9001 · 14001 · 45001

security (1).png

CDM 2015 Principal Designer

white-house.png

Live GMP environments

internet.png

United Kingdom and UAE

On a pharmaceutical site the plant next door is still making product. We plan closures so that contamination control, validation and supply are never put at risk.

We manage the decommissioning, dismantling and demolition of redundant pharmaceutical plant and buildings on the client’s behalf, from pilot plants and laboratories to primary and secondary manufacturing and site utilities. We set the decommissioning end states, manage the hazardous materials surveys, plan the segregation from operating areas, and procure and oversee the specialist contractors, working within the site’s change control and quality systems.

SITE TYPES

Primary and API manufacturing

Secondary and formulation plant

Laboratories and pilot plants

Clean rooms and HVAC systems

Solvent storage and recovery

Site utilities and warehousing

WHAT WE SOLVE

The challenges on pharmaceutical sites

Working beside live GMP areas

Segregation, contamination control, programme windows and change control agreed with quality and operations before any work starts.

Active ingredients and potent compounds

Residues in plant and ductwork characterised before tender and decontaminated to the agreed end state before dismantling.

Solvents and hazardous areas

Isolation, purging and hot work controls for solvent systems and classified areas built into the method.

Asset recovery and plant reuse

Equipment with resale or redeployment value identified early and removed intact, so value is recovered rather than scrapped.

QUESTIONS

Common questions

Not covered here? Our team will answer directly.

Discuss your project
Safety and compliance

Safety is the method.

Isolation, decontamination and preparation come first, on every site, under certified management systems.

ISO 9001

Quality management

ISO 14001

Environmental management

ISO 45001

Occupational health and safety

CDM 2015

Principal Designer

IDE

Institute of Demolition Engineers

APS

Association for Project Safety

TWf

Temporary Works Forum

Capability statement

Download the PDF

News

Reading for pharmaceutical site teams

bottom of page