Decommissioning project management
Client-side management of the decommissioning of industrial plant, from live operation to a safe, clean and documented state ready for demolition. We plan it, procure the specialists and manage them to one programme, on live and redundant high-hazard sites worldwide.
01
Assess
02
Decommission
03
Demolish
04
Recover
05
Remediate


SAFETY AND COMPLIANCE
Safety first.
On every site, in every plan.
Assurance is designed into every stage, protecting people, programme and reputation from day one.
ISO
45001
Occupational health & safety
ISO
14001
Environmental management
ISO
9001
Quality management
ISO
SSIP
Cyber Essentials +
UK
TWF Member
Principal Designer capability
ISO
IDE
Subject Matter Experts
ISO
APS
APS Principal Designers
ISO
GLOBAL
Subject Matter Experts
OVERVIEW
Before demolition starts.
Isolated, clean and proven.
Decommissioning is where most of the hazard sits and where most of the cost is decided. Isolation, draining, purging, cleaning and decontamination take a plant from live operation to a state in which it can be dismantled, and every shortcut taken here is paid for twice during demolition.
We act for the owner. We set the decommissioning end state for every system, plan the isolations with the operator, scope and procure the specialist contractors, monitor their work against method and programme, and report progress, cost and safety every week. Decommissioning hands over to demolition only when the end state has been met and documented.
AT A GLANCE
STAGE
02 Decommission
SITE TYPES
Refineries, terminals and tank farms, power stations, chemical, petrochemical and pharmaceutical plants
REGIONS
Worldwide, from hubs in the United Kingdom and the UAE
STANDARDS
ISO 9001 · 14001 · 45001 · CDM 2015 (UK) and equivalent client duties elsewhere
Scope
What's included
Everything needed to take the plant from live operation to a safe, clean and documented state, managed by one accountable team.
Hazardous materials
Isolation philosophy, sequence and verification agreed with the operator.
Contractor management
Isolation philosophy, sequence and verification agreed with the operator.
Progress, cost and safety reporting
Isolation philosophy, sequence and verification agreed with the operator.
Decommissioning strategy and end states
Isolation philosophy, sequence and verification agreed with the operator.
Isolation and making-safe planning
Isolation philosophy, sequence and verification agreed with the operator.
Draining, purging and decontamination
Isolation philosophy, sequence and verification agreed with the operator.

How we work
Four steps to a safe, prepared site
01
Survey and records
Walkdowns, drawings, process and hazard data checked against the plant as it stands.
02
Plan and isolate
End states, isolation sequence, permits and programme agreed with the operator.
03
Decontaminate and prepare
Contractors managed through draining, cleaning and decontamination to the end state.
04
Prove and hand over
End state verified by the appropriate specialists, documented and handed to demolition.