Licensed sites,
decommissioned to the safety case.

Decommissioning and demolition management, technical assurance and CDM services on nuclear licensed sites, delivered within the site licence company’s arrangements, security requirements and safety case.

check.png

ISO 9001 · 14001 · 45001

security (1).png

CDM 2015 Principal Designer

white-house.png

Nuclear licensed sites

internet.png

United Kingdom and UAE

On a nuclear site, the decommissioning sequence is set by the safety case and the waste route, not the demolition programme. We plan the conventional work to fit both.

We support site licence companies and their supply chains on the decommissioning and demolition of redundant buildings and plant on nuclear licensed sites. Our role is the conventional decommissioning and demolition discipline: defining end states, managing asbestos and hazardous materials surveys, scoping and procuring demolition packages, assessing contractor methods and temporary works proposals, and reporting progress, cost and risk, all within the client’s nuclear safety, security and quality arrangements. Radiological characterisation, safety case and waste sentencing remain with the licensee and its specialist advisers.

SITE TYPES

Reactor ancillary and auxiliary buildings

Turbine halls and blower houses

Legacy process and research facilities

Ventilation, stacks and services

Workshops, stores and site infrastructure

Active and inactive facilities awaiting demolition

WHAT WE SOLVE

The challenges on nuclear sites

Working to the safety case

Demolition scope, sequence and method developed to fit the licensee’s safety case, categorisation and hold-point arrangements, with the evidence each step needs.

Asbestos alongside contamination

Older buildings hold asbestos where radiological controls also apply. We plan the surveys and removal so both sets of controls are met and waste goes to the right route.

Security, access and clearances

Programmes that allow for site access arrangements, escorting, vetting and the time they take, so delays are planned for rather than discovered.

Nuclear supply chain quality

Project quality plans, document control and assurance records that meet the licensee’s supply chain requirements and stand up to audit.

QUESTIONS

Common questions

Not covered here? Our team will answer directly.

Discuss your project
Safety and compliance

Safety is the method.

Isolation, decontamination and preparation come first, on every site, under certified management systems.

ISO 9001

Quality management

ISO 14001

Environmental management

ISO 45001

Occupational health and safety

CDM 2015

Principal Designer

IDE

Institute of Demolition Engineers

APS

Association for Project Safety

TWf

Temporary Works Forum

Capability statement

Download the PDF

News

Reading for nuclear site teams

bottom of page