Independent feasibility and strategy studies for the closure of industrial assets. We test the options, the method, the programme and the cost before anything is committed, so the decision to close is made on evidence.
01
Assess
02
Decommission
03
Demolish
04
Recover
05
Remediate


SAFETY AND COMPLIANCE
Safety first.
On every site, in every plan.
Assurance is designed into every stage, protecting people, programme and reputation from day one.
ISO
45001
Occupational health & safety
ISO
14001
Environmental management
ISO
9001
Quality management
ISO
SSIP
Cyber Essentials +
UK
TWF Member
Principal Designer capability
ISO
IDE
Subject Matter Experts
ISO
APS
APS Principal Designers
ISO
GLOBAL
Subject Matter Experts
OVERVIEW
Before the decision is made.
The whole closure, on paper first.
Closing an industrial asset is a project long before it is a demolition. The order in which units come down, what has to be isolated and cleaned first, where the asbestos and hazardous materials are, what the plant is worth as scrap or for resale, and what the ground needs afterwards all decide the cost and the programme. We work those questions through with the owner before a contractor is involved.
The study is built from the site, not from a formula. We walk the plant, review the records, survey what has to be surveyed and build the method and programme the way a contractor would, then price it with current market rates. The result is a strategy the owner can take to the board, to the regulator and to tender.
Scope
What's included
A site-specific study covering options, method, hazards, programme and cost, written so it can be used as the basis for the provision, the procurement and the project.
Site survey and records review
Isolation philosophy, sequence and verification agreed with the operator.
Options appraisal
Isolation philosophy, sequence and verification agreed with the operator.
End state definition
Isolation philosophy, sequence and verification agreed with the operator.
Materials inventory and residual value
Isolation philosophy, sequence and verification agreed with the operator.
Hazardous materials and remediation
Isolation philosophy, sequence and verification agreed with the operator.
Programme and cost estimate
Isolation philosophy, sequence and verification agreed with the operator.

How we work
Four steps to a safe, prepared site
01
Understand the asset
Site walkdowns, records, permits and stakeholder constraints reviewed with the operator.
02
Define the options
End states and closure options set out, with the hazards and constraints that apply to each.
03
Build the method and cost
Sequence, programme and bottom-up estimate developed for the preferred option.
04
Report and recommend
A study the owner can take to the board, the regulator and the market.