01 · Assess
Post-incident assessment and recovery
Independent engineering assessment, recovery planning and project management for industrial assets damaged by tank failure, fire, explosion or impact. We have supported owners from the first assessment of a damaged structure through making safe, hazardous materials removal, dismantling and demolition.
01
Assess
02
Decommission
03
Demolish
04
Recover
05
Remediate


SAFETY AND COMPLIANCE
Safety first.
On every site, in every plan.
Assurance is designed into every stage, protecting people, programme and reputation from day one.
ISO
45001
Occupational health & safety
ISO
14001
Environmental management
ISO
9001
Quality management
ISO
SSIP
Cyber Essentials +
UK
TWF Member
Principal Designer capability
ISO
IDE
Subject Matter Experts
ISO
APS
APS Principal Designers
ISO
GLOBAL
Subject Matter Experts
OVERVIEW
After the incident.
Engineering control from the first assessment.
A damaged asset is a different project from a planned closure. Structures may be unstable, residues unknown, asbestos disturbed, records lost in the event, and insurers, regulators and the operating business all need answers at once. The decisions taken in the first weeks set the cost and the safety of everything that follows.
We bring engineering assessment and project discipline to that period and to the recovery that follows. We assess the condition of the structure with the right specialists, define what has to be done to make it safe, plan the hazardous materials removal where normal methods cannot be used, and procure and manage the dismantling, demolition and remediation to the agreed end state, keeping the records insurers and regulators will ask for.
AT A GLANCE
STAGE
01 · Assess
SITE TYPES
Storage tanks and tank farms, refineries and chemical plants, power stations, manufacturing, conflict-damaged industrial assets
REGIONS
Worldwide, from hubs in the United Kingdom and the UAE
STANDARDS
ISO 9001 · 14001 · 45001 · CDM 2015 (UK) and equivalent client duties elsewhere
Scope
What's included
From the first engineering assessment of a damaged asset to its safe dismantling and the restoration of the site.
Recovery strategy and programme
Isolation philosophy, sequence and verification agreed with the operator.
Separation from live operations
Isolation philosophy, sequence and verification agreed with the operator.
Records for insurers and regulators
Isolation philosophy, sequence and verification agreed with the operator.
Engineering assessment
Isolation philosophy, sequence and verification agreed with the operator.
Making-safe strategy and procurement
Isolation philosophy, sequence and verification agreed with the operator.
Hazardous materials in damaged structures
Isolation philosophy, sequence and verification agreed with the operator.

How we work
Four steps to a safe, prepared site
01
Assess
Condition, hazards and constraints assessed with specialists, and immediate making-safe needs defined.
02
Plan
Making-safe, hazardous materials and recovery strategies developed and agreed with the owner, insurers and regulators.
03
Procure and manage
Specialist contractors procured for each stage and managed against method, programme and cost.
04
Close out
The agreed end state reached and documented, with records that stand up to insurer and regulator scrutiny.