CDM Principal Designer
CDM 2015 Principal Designer services for decommissioning, asbestos removal and demolition projects in the United Kingdom. We plan, manage and coordinate health and safety in the pre-construction phase, as a stand-alone appointment or alongside our project management role.
01
Assess
02
Decommission
03
Demolish
04
Recover
05
Remediate


SAFETY AND COMPLIANCE
Safety first.
On every site, in every plan.
Assurance is designed into every stage, protecting people, programme and reputation from day one.
ISO
45001
Occupational health & safety
ISO
14001
Environmental management
ISO
9001
Quality management
ISO
SSIP
Cyber Essentials +
UK
TWF Member
Principal Designer capability
ISO
IDE
Subject Matter Experts
ISO
APS
APS Principal Designers
ISO
GLOBAL
Subject Matter Experts
OVERVIEW
Designed out before it reaches site.
The Principal Designer for demolition.
On a demolition or asbestos removal project the design is the sequence, the method and the temporary works, and the foreseeable risks are in the structure, the residues and the materials. The Principal Designer’s duty under CDM 2015 is to make sure those risks are identified, eliminated where they can be and reduced where they cannot, and that the information contractors need is in place before work starts.
We are appointed Principal Designer by owners who want that duty discharged by people who understand decommissioning, asbestos and demolition, rather than a general construction practice. We prepare the pre-construction information, review designers’ and contractors’ risk information, coordinate the health and safety aspects of the demolition sequence and temporary works, and prepare the health and safety file. The appointment stands alone or sits alongside our Owner’s Engineer or project management role.
AT A GLANCE
STAGE
02 Decommission
SITE TYPES
Power stations, refineries and terminals, chemical and pharmaceutical plants, nuclear licensed sites, industrial buildings and structures
REGIONS
United Kingdom (CDM 2015). Equivalent client-side health and safety coordination is provided elsewhere under our Owner’s Engineer service.
STANDARDS
CDM 2015 · BS 6187 · Control of Asbestos Regulations 2012 · ISO 9001 · 14001 · 45001
Scope
What's included
The Principal Designer duties under CDM 2015, discharged by people who know decommissioning, asbestos and demolition.
Health and safety file
Isolation philosophy, sequence and verification agreed with the operator.
Pre-construction information
Isolation philosophy, sequence and verification agreed with the operator.
Design risk management
Isolation philosophy, sequence and verification agreed with the operator.
Asbestos and hazardous materials
Isolation philosophy, sequence and verification agreed with the operator.
Designer and contractor coordination
Isolation philosophy, sequence and verification agreed with the operator.
Client advice
Isolation philosophy, sequence and verification agreed with the operator.

How we work
Four steps to a safe, prepared site
01
Establish the appointment
Client duties, scope, notification and the project team confirmed in writing.
02
Assemble the information
Surveys, structural records, hazardous materials and site constraints gathered and gaps closed.
03
Coordinate the design
Sequence, method and temporary works reviewed with designers and the Principal Contractor for foreseeable risk.
04
Hand over
Health and safety file compiled and handed over at completion.