High-hazard sites,
safely closed.
Decommissioning and demolition management, Owner’s Engineer and CDM services for process units, chemical plants and storage on COMAH and other high-hazard establishments, from first study to the agreed end state.

ISO 9001 · 14001 · 45001
.png)
CDM 2015 Principal Designer

COMAH and high-hazard sites

United Kingdom and UAE
Chemical plant carries the highest hazard and the most scrutiny. We plan its closure around the residues, the regulators and the live units next door, and hold the contractor to that plan.
From a single redundant unit to the phased closure of a whole complex, we manage the decommissioning, demolition and remediation of petrochemical and chemical plant on the client’s behalf. We define a decommissioning end state for every system, characterise residues and legacy materials so removal is priced on evidence, procure the contractors under contract forms suited to demolition, and hold them to the plan.
SITE TYPES
Cracker and process units
Chlor-alkali and mercury cell plants
Tank farms and chemical storage
Effluent and utilities plant
Pipe racks, pipelines and jetties
Flare systems
WHAT WE SOLVE
The challenges on petrochemical and chemical sites
Process residues and contaminated plant
Residues in vessels, lines and tanks, including mercury and other persistent contaminants, characterised and quantified before tender and cleaned to the agreed end state before cutting starts.
Major accident regulation
COMAH in the UK, Seveso in Europe and the equivalent regimes elsewhere: notifications, safety report changes and regulator meetings planned into the programme from the outset.
Missing or incomplete site information
Drawings and records rebuilt from surveys and site inspection, so the scope matches the plant and the tender prices the real quantities.
Live units beside redundant plant
Isolations, exclusion zones and permit-to-work arrangements that keep the operating site running safely.
Safety and compliance
Safety is the method.
Isolation, decontamination and preparation come first, on every site, under certified management systems.
ISO 9001
Quality management
ISO 14001
Environmental management
ISO 45001
Occupational health and safety
CDM 2015
Principal Designer
IDE
Institute of Demolition Engineers
APS
Association for Project Safety
TWf
Temporary Works Forum
Capability statement
Download the PDF