Decommissioning project management

01 Assess

Asset retirement obligations and cost estimating

Independent engineering estimates of what it will cost to decommission, clear and restore an industrial asset, for the provision on the balance sheet and for the budget on the project. Built on real scopes, real hazards and real demolition prices.

Discuss your project
01

Assess

02

Decommission

03

Demolish

04

Recover

05

Remediate

Gemini_Generated_Image_8k02dr8k02dr8k02.jpg
432ffe15-3745-4881-9b11-9ab4fac56921.png
SAFETY AND COMPLIANCE

Safety first.
On every site, in every plan.

Assurance is designed into every stage, protecting people, programme and reputation from day one.

ISO

45001

Occupational health & safety
ISO

14001

Environmental management
ISO

9001

Quality management
ISO

SSIP

Cyber Essentials +
UK

TWF Member

Principal Designer capability
ISO

IDE

Subject Matter Experts
ISO

APS

APS Principal Designers
ISO

GLOBAL

Subject Matter Experts
OVERVIEW

The obligation is legal.

The number should be engineering.

Every industrial asset carries an obligation to be taken out of service, dismantled and the land put back to an agreed condition. It comes from permits, licences, leases, concession agreements and regulation, and accounting standards require it to be measured while the asset is still operating, as a decommissioning provision under IAS 37 and IFRIC 1, an asset retirement obligation under ASC 410-20, or a provision under FRS 102. Most provisions were set years ago as a percentage of capital cost and have been indexed since. Few were built from the asset as it stands.

We provide the engineering basis of the provision: the obligation mapped to its source, the end state defined, the asbestos and hazardous materials liability quantified, and a bottom-up estimate with programme, risk allowance and a register of every assumption, stated in today’s money so finance can apply inflation and discounting under the standard that applies. We also provide cost estimating, budgeting and cost control through the project itself, so the number that went into the accounts is the number the project is run to.

AT A GLANCE
STAGE

01 Assess

SITE TYPES

Refineries, terminals, power stations, chemical and pharmaceutical plants, nuclear licensed sites, manufacturing

REGIONS

Worldwide, from hubs in the United Kingdom and the UAE

STANDARDS

Estimates prepared to support IAS 37, IFRIC 1, ASC 410-20 and FRS 102 · ISO 9001 · 14001 · 45001

Scope

What's included

Everything finance, auditors and the project need from the engineering side of a decommissioning provision, and the cost control to deliver against it.

Obligation mapping

Isolation philosophy, sequence and verification agreed with the operator.

Review of existing provisions

Isolation philosophy, sequence and verification agreed with the operator.

End state and scope definition

Isolation philosophy, sequence and verification agreed with the operator.

Hazardous materials liability

Isolation philosophy, sequence and verification agreed with the operator.

Cost control through delivery

Isolation philosophy, sequence and verification agreed with the operator.

Engineering cost estimate

Isolation philosophy, sequence and verification agreed with the operator.

Bacground
ONE PARTNER, WHOLE LIFECYCLE

Where this service sits

The estimate follows the strategy and precedes the project. It is built the way the work will be procured, so when the asset closes it becomes the budget, the scope and the basis for the tender, and the people who produced it carry it through.

How we work

Four steps to a safe, prepared site

01

Map the obligation

Permits, licences, leases and regulation reviewed for what each requires at end of life.

02

Define and survey

End state and scope defined; asbestos and hazardous materials surveys scoped and managed.

03

Estimate and document

Quantities, methods, rates, programme, risk allowance and assumptions built up and recorded.

04

Support and update

Auditors’ questions answered; the estimate re-measured when the closure date, end state, surveys or market change.

Related project
gas-leak-detection-v2.png
UK
Decommissioning PM
Petrochemical

Chemical site demolition case study:

How fixed-price tenders, scrap revenue and contract amendments written for demolition gave a UK chemical site owner greater cost certainty.

View case study
QUESTIONS

Common questions

Not covered here? Our team will answer directly.

Discuss your project
Across the lifecycle

Related services

All services
01 · Assess

Decommissioning and demolition strategy

Options, programme and cost tested before you commit, so the right scope goes to tender.

Explore service
02 · Decommission

Decommissioning project management

Isolation, cleaning and plant preparation managed to one safe programme.

Explore service
05 Remediate

Remediation and site closure management

Investigation, remediation and verification managed to the agreed end state.

Explore service