Risk assessment and quantitative risk analysis
Structured hazard review of the plant, the structures and the site around them, and quantitative risk analysis of cost and programme using Monte Carlo simulation. The risks that decide how a plant can be decommissioned and demolished, identified and quantified before they decide it for you.
01
Assess
02
Decommission
03
Demolish
04
Recover
05
Remediate


SAFETY AND COMPLIANCE
Safety first.
On every site, in every plan.
Assurance is designed into every stage, protecting people, programme and reputation from day one.
ISO
45001
Occupational health & safety
ISO
14001
Environmental management
ISO
9001
Quality management
ISO
SSIP
Cyber Essentials +
UK
TWF Member
Principal Designer capability
ISO
IDE
Subject Matter Experts
ISO
APS
APS Principal Designers
ISO
GLOBAL
Subject Matter Experts
OVERVIEW
Find the hazards first.
Then quantify what they cost.
On a high-hazard site the method, sequence and cost of a closure are set by what is in the plant and around it: hydrocarbon and chemical residues, asbestos and other hazardous materials, structures weakened by age or fire, live units and services next door, and the public, the water and the neighbours beyond the fence. A hazard review brings those together early, from the site’s own records and from survey, so the strategy and the tender are built on them.
We run the review as a structured study with the operator and, where appointed, the contractor, using a prompt-list approach developed across power, petrochemical and chemical sites. The output is a hazard and risk register tied to the method and sequence, a list of the surveys and information still needed, and a clear view of which risks must be designed out and which are left to be managed on site. Our risk analysts then quantify the cost and programme risk by Monte Carlo simulation, so contingency, the provision and the tender allowances are set on evidence rather than a percentage.
AT A GLANCE
STAGE
01 Assess
SITE TYPES
Refineries, terminals, power stations, chemical and pharmaceutical plants, damaged and fire-affected structures
REGIONS
Worldwide, from hubs in the United Kingdom and the UAE
STANDARDS
ISO 9001 · 14001 · 45001 · CDM 2015 (UK) and equivalent client duties elsewhere · BS 6187
Scope
What's included
A structured hazard review of the plant, the structures and the surroundings, with a risk register that drives method, surveys and contingency.
Live interfaces and surroundings
Isolation philosophy, sequence and verification agreed with the operator.
Risk register and method implications
Isolation philosophy, sequence and verification agreed with the operator.
Quantitative risk analysis (QRA)
Isolation philosophy, sequence and verification agreed with the operator.
Structural condition
Isolation philosophy, sequence and verification agreed with the operator.
Residues and hazardous materials
Isolation philosophy, sequence and verification agreed with the operator.
Hazard identification workshop
Isolation philosophy, sequence and verification agreed with the operator.

How we work
Four steps to a safe, prepared site
01
Gather the information
Records, drawings, surveys and incident history collected and the gaps identified.
02
Review the hazards
Structured workshop with the operator and specialists, section by section through the plant.
03
Quantify
Cost and programme risk modelled by Monte Carlo simulation; the risks that drive the outcome ranked.
04
Set the actions
Surveys, design changes, controls and evidence-based contingency agreed and recorded.